Friday, October 31, 2014

Alert

Follow us:
Follow us on Facebook Follow us on Twitter Subscribe to this news feed 

News

CNY

Nine Mile 1 shutdown for repairs

  • Text size: + -
CNY/NNY/S. Tier: Nine Mile 1 shutdown for repairs
Play now

Time Warner Cable video customers:
Sign in with your TWC ID to access our video clips.

  To view our videos, you need to
enable JavaScript. Learn how.
install Adobe Flash 9 or above. Install now.

Then come back here and refresh the page.


OSWEGO COUNTY, N.Y. -- An electrical grid disturbance forced the shutdown of Nine Mile 1 Monday night.

Constellation Energy says a lighting pole fell onto an electrical component. The reactor automatically shutdown because it couldn't transmit power.

Owners say that Nine Mile 1 will go back online when repairs are made to the grid. Unit 2 has been running at full power during the interruption.

10.11.12.245 ClientIP: 174.129.92.127, 23.3.13.77 UserAgent: CCBot/2.0 (http://commoncrawl.org/faq/) Profile: TWCSAMLSP